Buoys all done, just need numbering.
The tie down chains have been tightened up and replaced where needed. Thanks to Mr B, Alan,Tony, Craig and David.
Erling held court in the Club House whilst Keith did some more splicing. In the warm.
The Butty Man kept us supplied with food and drink.
One job to be added to the list. The door stop for the gents changing room door needs replacing.
Well done everyone.